In 2024, we participated in the construction of East Village Phase One in St. Albert, AB. It is a six-storey 70,000 square foot facility built with innovative cold-formed steel framing panels and a floor and roof cassette system, ensuring strength, durability, and efficiency.
East Village Phase One, St. Albert, Alberta
- 6-storey residential building
- 70,000 square feet
- Cold-formed steel framing panels
- Floor and roof cassette system
- St. Albert, Alberta


